Thai Frigate

Elecsis are designing, and manufacturing a range of shock tested LV switchgear and control equipment

This equipment is for The Navantia Frigate for Thailand.  The equipment has been tested to a high level of shock in a UK based test facility to prove the equipment’s suitability for the vessel.

The new frigate was built in DSME’s Okpo yard – 4,000 tonnes, costing around $453m, and has now been commissioned. 

Trust and Worth

Our Clients